BIM

The Full Life Cycle BIM system of Zhongcheng International is mainly designed for management of the four stages of project: consulting, design, construction and operation. It covers the whole process of project, where the digital model is created, managed and shared for the project under construction.

  • Project Opportunity Research
  • Analysis of Financing channel
  • Analysis of Market Forecast
  • Visual Design
  • Collaborative Management
  • Data Exchange
  • Decision Support
  • Virtual Construction
  • Progress Control
  • Cost Control
  • Security Control
  • Optimization of Scheme
  • Operational Real-time Control
  • Asset Management
  • Safety Emergency Management

Consultation

Design

Building

Operation

  • Design Institute
  • Equipment Manufacturers
  • Construction Organization
  • Investors
  • Other
  • Alternate Text

    Consultation & Design

    In the early stage of project planning and design, based on BIM technology, simulation analysis is carried out on the project scheme and investment strategy. By visualizing BIM model, we improve the decision-making participation and maximally optimize the project implementation plan.

  • Building

    Using BIM technology the key nodes of the construction model and site arrangement can be perfectly displayed and be associated with core business data in progress, cost, quality, safety and material. Through the construction process simulation, progress schedule and construction scheme, can be optimized to guarantee the smooth completion of the project construction.

    Alternate Text
  • Alternate Text

    Operation

    During the operation&maintenance; phase, BIM combines with Internet + GIS + 10T + GPS for infrastructure management and O&M; management. Through virtual simulation technology, the input-output efficiency of different O&M; schemes can be analyzed and the influence that the operation brings to the maintenance work can be simulated, in order to propose advanced and reasonable O&M; plan to support operation decision, operation supervison and tracking.

  • Alternate Text

    Location:Building 2, NO.176 Haier Road

  • Alternate Text

    Telephone:0532-85909188

  • Alternate Text

    Fax:0532-85909189

OA
Alternate Text Alternate Text

Copyright © 2016 China Integrity International Oceaneering Co. Ltd All rights reserved design dongbaqu